We were awarded to strengthen postharvest infrastructure project at Gumma, districtShimla (HP) in EPC mode in district Shimla, (HP) by HPMC funded by World Bank . This includes Pre-Engineered steel structure (PEB), Refrigeration Plant , C. A. Plant Equipment, Strengthening of existing G&P facility, Wooden Bins , Material Handling ( MH) &Miscellaneous Equipment and Hydro- Cooler for Cherries. We created along with 800 MT, an additional CA storage capacity of approximately 1450 MT for storage of apples based on storage for big bins with maximal daily volume loaded during loading period as 140 MT. The walls and ceiling of the CA chambers were built up with continous (PUF) panels .